dc.contributor.authorWilliam Fast
dc.date.accessioned2020-03-16T17:50:23Z-
dc.date.available2020-03-16T17:50:23Z-
dc.date.issued2014-04-30
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/1124-
dc.descriptionAcquisition Management / NPS Faculty Research
dc.description.abstractThe 2013 Annual Report on the Performance of the Defense Acquisition System (USD[AT&L], June 28, 2013) identified a need for additional analysis of recent acquisition policies (DoDI 5000.02, December 2008) to reduce program technical risk by requiring competitive prototyping for risk reduction and a Preliminary Design Review (PDR) before Milestone B. This research uses cost and schedule estimates from Major Defense Acquisition Programs (MDAPs) to determine if competitive prototyping and PDRs held prior to Milestone B have resulted in mature technologies (defined as Technology Readiness Level 6 or above) and subsequently reduced program cost and schedule slippage.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesManaging Risk
dc.relation.ispartofseriesSYM-AM-14-071
dc.subjectRisk Reduction
dc.subjectPrototyping
dc.subjectCost and Schedule
dc.titleEffectiveness of Competitive Prototyping and Preliminary Design Review Prior to Milestone B
dc.typeArticle
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
SYM-AM-14-071.pdf1.25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.