Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/153
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMichael Pennock
dc.contributor.authorBill Rouse
dc.contributor.authorDiane Kollar
dc.date.accessioned2020-03-16T17:06:05Z-
dc.date.available2020-03-16T17:06:05Z-
dc.date.issued2007-04-01
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/153-
dc.descriptionAcquisition Management / Grant-funded Research
dc.description.abstractModern military systems increasingly rely on the integration of multiple advanced technologies. While these technologies vastly increase warfighter capabilities, they also introduce risk into the system design and development process that tends to increase both its cost and duration. As acquisition cycle-times increase, warfighters must make do with dated technology for longer periods. Thus, there is an incentive to push as many advanced technologies as possible into each program to maximize warfighter capability over the next acquisition cycle. Unfortunately, the more new technologies a system has, the more risky its acquisition becomes, and consequently, its duration and cost increase even further. Thus, there is a feedback effect that exacerbates the problem. Open-architecture designs can partially alleviate this problem, but some technology decisions are so integral to a system's design that they cannot be relegated to future upgrades. Consequently, there is a tradeoff between incorporating these technologies now and increasing program risk or developing and evaluating them further but potentially postponing their application to future acquisition cycles. Our paper will examine this tradeoff by considering a new technology's contribution to program risk.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesOpen Architecture (OA)
dc.relation.ispartofseriesNPS-AM-07-005
dc.subjectAcquisition Cycle-Times
dc.subjectOpen-Architecture Designs
dc.titleDevelopment vs. Deployment: How Mature Should a Technology be Before it is Considered for Inclusion in an Acquisition Program?
dc.typeArticle
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
NPS-AM-07-005.pdf150.21 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.