Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2012
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJohn D. Draper
dc.contributor.authorEdward M. Caricato
dc.date.accessioned2020-03-16T18:07:42Z-
dc.date.available2020-03-16T18:07:42Z-
dc.date.issued2011-11-05
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/2012-
dc.descriptionFinancial Management / Graduate Student Research
dc.description.abstractMateriel Returns Program (MRP) credits have increased 1st Marine Logistics Groups (1st MLG) total obligation authority by an average of 27% annually since 2008. However, 1st MLG has been unable to leverage the MRP in budget execution due to an inability to forecast future credits. The purpose of this research is to determine whether analysis of historical MRP credits at 1st MLG could enable the comptroller to forecast future credits, which would enable 1st MLG to leverage MRP credits and budget more efficiently in a constrained fiscal environment. This research utilized descriptive analysis of historical credits to identify systemic patterns or trends associated with the MRP. The analysis of MRP credits focused on two specific areas: (1) the accuracy of credit estimates provided by the sources of supply (SOSs), and (2) the amount of time it took for 1st MLG to receive the actual credit. The primary finding of this research was that 1st MLG should be able to forecast MRP credits. The research showed that historically over a two-year period, SOSs accurately estimated credits 88.3% of the time and SOSs issued 95% of all actual credits within 90 days of 1st MLG submitting an item into the MRP.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesMaterial Returns Program (MRP)
dc.relation.ispartofseriesNPS-FM-11-179
dc.subjectMaterial Returns Program (MRP)
dc.subjectMarine Logistics Group (MLG)
dc.subjectReparable Issue Point (RIP)
dc.titleAnalysis of Historical Materiel Return Program (MRP) Credits at the 1st Marine Logistics Group Reparable Issue Point (RIP)
dc.typeTechnical Report
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-FM-11-179.pdf2.66 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.