Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/2352
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Katelyn M. George | - |
dc.contributor.author | Eliah J. Ledbetter | - |
dc.date.accessioned | 2020-03-16T18:10:21Z | - |
dc.date.available | 2020-03-16T18:10:21Z | - |
dc.date.issued | 2020-02-04 | - |
dc.identifier.citation | Published--Unlimited Distribution | - |
dc.identifier.uri | https://dair.nps.edu/handle/123456789/2352 | - |
dc.description | Cost Estimation / Graduate Student Research | - |
dc.description.abstract | This thesis examines the basics of total ownership cost (TOC) modeling over the life cycle of electro-optic/infrared sensors, including the inception phase of Acquisition Costs, followed by annual Operations and Maintenance (O&M) expenses, and a final set of Disposition Costs at the end of life of the sensor. This model allows cost analysts to have better decision analytics of the costs for use in cost comparisons across sensor platforms, return on investment analysis, portfolio allocation of resources, and analysis of alternatives. The findings show that the developed model is functional and could be used in the Department of Defense total ownership cost estimation process to facilitate decisions among sensor platforms. | - |
dc.description.sponsorship | Acquisition Research Program | - |
dc.language | English (United States) | - |
dc.publisher | Acquisition Research Program | - |
dc.relation.ispartofseries | Costing | - |
dc.relation.ispartofseries | NPS-CE-20-030 | - |
dc.subject | Cost Estimation | - |
dc.subject | Acquisition | - |
dc.subject | Risk Assessment | - |
dc.subject | Monte Carlo Risk Simulation | - |
dc.subject | Total Ownership | - |
dc.subject | Life-Cycle Cost Model | - |
dc.subject | Electro-Optical Infrared | - |
dc.subject | Sensors | - |
dc.subject | Surface Ships | - |
dc.subject | Operations and Maintenance | - |
dc.subject | Total Ownership Cost Model | - |
dc.subject | Cost Model Under Uncertainty | - |
dc.subject | Procurement | - |
dc.subject | NAVSEA | - |
dc.subject | Warfare System | - |
dc.subject | DoD Acquisition | - |
dc.subject | PEO IWS | - |
dc.title | A Total Ownership With Life-Cycle Cost Model Under Uncertainty for Surface Ship Electro-Optic and Infrared Systems | - |
dc.type | Technical Report | - |
Appears in Collections: | NPS Graduate Student Theses & Reports |
Files in This Item:
File | Size | Format | |
---|---|---|---|
NPS-CE-20-030.pdf | 11.18 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.