Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2497
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDavid N. Ford
dc.contributor.authorThomas J. Housel
dc.contributor.authorJohnathan C. Mun
dc.date.accessioned2020-03-16T18:18:01Z-
dc.date.available2020-03-16T18:18:01Z-
dc.date.issued2011-09-20
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/2497-
dc.descriptionAcquisition Management / NPS Faculty Research
dc.description.abstractThe current cost-constrained environment within the federal government and Department of Defense (DoD) requires a cogent approach to cost reductions that will not compromise the productivity of core defense support processes such as ship maintenance, a core process that is central to naval operations. The SHIPMAIN initiative was designed to standardize ship maintenance alternations in order to take advantage of the cost savings from standardizing core processes. A problem in using the SHIPMAIN approach has been that the normal cost-reduction learning curve for common ship alterations, across a series of common ship platforms, has not materialized. This study uses the knowledge value added (KVA) + systems dynamics (SD) + integrated risk management (IRM) methodology to estimate, analyze, and optimize the potential cost savings and productivity improvements available by moving to a ship maintenance approach that incorporates the 3D TLS and collab-PLM tool suite. Results suggest that when the SHIPMAIN process employs 3D terrestrial laser scanning (3D TLS) and collaborative product lifecycle management (collab-PLM) tools, SHIPMAIN will finally obtain the prophesized learning curve benefits. The results indicated that the biggest bang for buck is in using the combination of the two technologies. Results of the KVA and SD scenario analysis provided the financial information required to forecast an optimized portfolio controlling for risk using the IRM methodology and tool suite. Results indicate that both rapid and incremental implementation approaches generate significant savings and that other factors should be incorporated into final implementation of the 3DTLS + collab-PLMtool tools.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesRisk Analysis
dc.relation.ispartofseriesNPS-AM-11-180
dc.subjectKnowledge Value Added
dc.subjectSimulation Modeling
dc.subjectPortfolio Optimization
dc.subjectReal Options
dc.subjectRisk Management
dc.subjectTechnology Adoption
dc.titleShip Maintenance Processes with Collaborative Product Life Cycle Management and 3D Terrestrial Laser Scanning Tools: Reducing Costs and Increasing Productivity
dc.typeTechnical Report
Appears in Collections:Sponsored Acquisition Research & Technical Reports

Files in This Item:
File SizeFormat 
NPS-AM-11-180.pdf771.62 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.