Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2607
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJohn M. Colombi
dc.contributor.authorJ. Robert Wirthlin
dc.contributor.authorTeresa Wu
dc.date.accessioned2020-03-16T18:18:41Z-
dc.date.available2020-03-16T18:18:41Z-
dc.date.issued2014-02-20
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/2607-
dc.descriptionAcquisition Management / Grant-funded Research
dc.description.abstractThe Department of Defense (DoD) acquisition system is challenged by schedule and cost overruns that can be attributed to a complex acquisition process. This process drives great research interests in exploring intervention strategies that would help reduce program delays. However, quantitatively evaluating the impact of new policy has been limited due to the lack of system models with appropriate fidelity. The application of a simulation model to address this challenge thus becomes a promising approach. In this research, we explore the application of the Enterprise Requirements and Acquisition Model (ERAM), a discrete event simulation of the DoD acquisition system, to quantitatively examine several interventions. Recent studies indicate that policies that address (1) scope growth, (2) acquisition process variability, and (3) program technology maturity should be investigated because they may have a significant impact on reducing program completion time. Thus, the effect of scope growth frequency and size, technology maturity, and changing variability and mean process times in several government and contractor pre-Milestone C activities are investigated. Additional research includes an engineering bottleneck analysis, the effects of requiring that all program types conduct an analysis of alternatives (AoA), and modeling extensions for understanding post-Milestone C space launch delays. The insights gained from the simulation experiments can potentially help formulate new policies to improve DoD acquisition.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesERAM
dc.relation.ispartofseriesAFIT-AM-14-009
dc.subjectDefense Acquisition Program
dc.subjectProcess Modeling
dc.subjectSimulation
dc.subjectSensitivity Analysis
dc.subjectBottleneck Analysis
dc.subjectSystems Engineering Processes
dc.titleEnterprise Requirements and Acquisition Model (ERAM) Analysis and Extension
dc.typeTechnical Report
Appears in Collections:Sponsored Acquisition Research & Technical Reports

Files in This Item:
File SizeFormat 
AFIT-AM-14-009.pdf943.78 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.