dc.contributor.authorKate Gill
dc.contributor.authorKirsty Carter Brown
dc.date.accessioned2020-03-16T17:27:39Z-
dc.date.available2020-03-16T17:27:39Z-
dc.date.issued2010-04-30
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/278-
dc.descriptionAcquisition Management / Grant-funded Research
dc.description.abstractThe UK Ministry of Defence (MoD) spends �2.6 billion per year (MoD, 2008, Section 1.2; 2007, p. 2) on research and development (R&D) (Defense Technology, 2009, p. 22). The figure is technically correct, but it conceals more than it reveals. Of the total, the MoD spends around �500 million (MoD, 2006, p. 8) on laboratory research and on taking what emerges from the lab in its first few steps down the long road that leads eventually to mature technology embedded in military equipment. Analysis based on UK National Audit Office (NAO) data (Stationery Office, 2006, November 24; 2008, p. 5) shows that about half of project timescale overruns are due to technology maturation occurring too late (Jordan & Dowdy, 2007, p. 16). US evidence shows that defence projects that get all their technology mature before the equivalent of Main Gate suffer only very small time and cost overruns thereafter (GAO, 2007, pp. 14-15). The first hypothesis would be that funding for technology development occurs too late in the acquisition process, when the problems that inevitably occur have a disproportionate effect on project timescales and costs. However, is this construct based on project failings or funding process failures? To improve the outcome, could we simply improve the timing allocation of funds? This research examines the profile of funding as aligned to maturity levels of technology and system and integration readiness, and makes proposals on the improvements that could be made.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesBudgeting
dc.relation.ispartofseriesNPS-AM-10-060
dc.subjectFinance
dc.subjectAcquisition
dc.subjectMaturity
dc.subjectMaturity Levels
dc.subjectTimescales
dc.subjectSystem Readiness
dc.subjectAudit
dc.subjectMoD; Ministry of Defence; Defence
dc.subjectDefense
dc.subjectSystems Engineering
dc.subjectDstl; Defence Science and Technology Laboratory
dc.subjectNational Audit Office
dc.subjectNAO
dc.titleFunding for Life: When to Spend the Acquisition Pot
dc.typeArticle
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
NPS-AM-10-060.pdf404.15 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.