Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/4176
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDavid Riel-
dc.date.accessioned2020-12-02T17:34:42Z-
dc.date.available2020-12-02T17:34:42Z-
dc.date.issued2020-03-30-
dc.identifier.citationPublished--Unlimited Distributionen_US
dc.identifier.urihttps://dair.nps.edu/handle/123456789/4176-
dc.descriptionAcquisition Management / Defense Acquisition Community Contributoren_US
dc.description.abstractAcross Congress and the DoD, a sense of urgency has arisen to provide warfighters with the latest innovative technology via rapid acquisition and fielding. However, the long-standing defense acquisition system was designed for a longer, methodical process of requirements development, phases, and milestones. To match the accelerated pace of today’s technology, the DoD culture must be challenged to maintain its technological edge. Yet, cultural inculcation implies a mindset that executes speed with responsible risk-taking across the workforce. The question becomes, how is schedule prioritized versus cost and performance in the program management (PM) “iron triangle” of cost, schedule, and performance; and how has that perception of the “speed of relevance” changed in the last two years with the DoD’s increased use of Fiscal Year (FY) 2016 National Defense Authorization Act’s Section 804, Middle Tier Acquisition, and introduction of the Adaptive Acquisition Framework (AAF)? By conducting quantitatively based, statistically valid surveying, this research studies the perceptions of acquisition professionals as to the importance of schedule speed when compared to cost and performance via a survey conducted in FY2018 compared with one conducted in FY2020. This paper also introduces methods for consideration to accelerate schedule to help propagate and sustain a culture of rapid and meaningful innovation, streamlined processes, and responsible risk-taking.en_US
dc.description.sponsorshipAcquisition Research Programen_US
dc.language.isoen_USen_US
dc.publisherAcquisition Research Programen_US
dc.relation.ispartofseriesAcquisition Speed;SYM-AM-20-038-
dc.subjectSchedule Accelerationen_US
dc.subjectDepartment of Defenseen_US
dc.subjectMiddle Tier Acquisitionen_US
dc.subjectCulture Changeen_US
dc.titleFaster Acquisition: Putting the Priority on Speeden_US
dc.typeArticleen_US
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File Description SizeFormat 
SYM-AM-20-038.pdf843.97 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.