Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/458
Title: | The Effect of Processes and Incentives on Acquisition Cost Growth |
Authors: | Doug Bodner Bill Rouse I-Hsiang Lee |
Keywords: | Cost Growth Incentive-Based Systems Organizational Simulation Multi-Actor Behavior |
Issue Date: | 30-Apr-2011 |
Publisher: | Acquisition Research Program |
Citation: | Published--Unlimited Distribution |
Series/Report no.: | Decision Support SYM-AM-11-055 |
Abstract: | Cost growth continues to be a serious concern in major acquisition programs. A variety of causes have been identified for cost growth, including low initial cost estimates, complex acquisition processes, and immature technologies. Incentive-based systems have been employed in an attempt at cost savings, with mixed results at best. This paper examines the role of process and incentive characteristics in cost growth. In particular, we study process concurrency, types of incentive contracts employed and the transfer point from cost-plus to fixed-price contracts, and the resulting effects on cost growth in the F-35 Joint Strike Fighter program. The F-35 program currently is in low-rate initial production. The emerging paradigm of organizational simulation is used in this study, since it combines process representations to model acquisition processes and agent representations to model multi-actor behavior, including reaction to incentives. Simulation experiments are conducted and analyzed to determine the effects of the factors described above on cost growth. |
Description: | Acquisition Management / Grant-funded Research |
URI: | https://dair.nps.edu/handle/123456789/458 |
Appears in Collections: | Annual Acquisition Research Symposium Proceedings & Presentations |
Files in This Item:
File | Size | Format | |
---|---|---|---|
SYM-AM-11-055.pdf | 256.53 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.