Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/469
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMuharrem Mane
dc.contributor.authorDaniel DeLaurentis
dc.date.accessioned2020-03-16T17:28:51Z-
dc.date.available2020-03-16T17:28:51Z-
dc.date.issued2011-04-30
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/469-
dc.descriptionAcquisition Management / Grant-funded Research
dc.description.abstractCapability-based acquisition has led to the simultaneous development of systems that must eventually interact within a system-of-systems (or major sub-systems that must integrate on a single platform). The necessary interdependencies between systems also generate complexity and can increase development risk. Trades between capability and risk are essential during analysis of alternatives in pre-acquisition phases. For example, while legacy assets can potentially provide a certain level of capability with relatively low risk, their eventual capability may be restricted because of some specific characteristic or inherent rigidity. These features create a trade-off space between development risk and capability potential of a system. Existing tools for such trades can be cumbersome and non-intuitive when complexity is high. The authors prior work has developed a Computational Exploratory Model to simulate the development process dynamics for these complex networks of systems intended for a system-of-systems capability. The progress documented in this paper couples the computational model with a capability module applied to the Airborne Laser (ABL) system and presents an exemplary analysis of alternatives by comparing expected development time and capability level under certain probabilities of disruption.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesSystems-of-Systems
dc.relation.ispartofseriesSYM-AM-11-066
dc.subjectCapability-Based Acquisition
dc.subjectSystem of Systems
dc.subjectABL System
dc.subjectComputational Exploratory Model
dc.subjectDevelopment Risk
dc.titleCapability and Development Time Trade-off Analysis in Systems-of-Systems
dc.typeArticle
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
SYM-AM-11-066.pdf329.58 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.