https://dair.nps.edu/handle/123456789/5514| Title: | Buying Flexibility: Converting Cost-Plus to Firm-Fixed-Price to Strengthen Mission Resilience |
| Authors: | Martin Jay Barlow |
| Keywords: | Contract Type Conversion Firm-Fixed-Price (FFP) Acquisition Risk and Incentives Mission Resilience and Flexibility Defense Industrial Base |
| Issue Date: | 30-Apr-2026 |
| Publisher: | Acquisition Research Program |
| Citation: | APA 7 |
| Series/Report no.: | Acquisition Management;SYM-AM-26-077 Acquisition Management;SYM-AM-26-183 |
| Abstract: | The Department of War has long relied on cost-reimbursement (CP) contracts to manage technical uncertainty, but continued use of cost-type instruments on mature, stable efforts imposes unnecessary administrative burden, diffuses contractor accountability, and slows delivery of warfighting capability. This paper proposes a readiness-gate framework for determining when and how to convert CP contracts to firm-fixed-price (FFP) arrangements. Drawing on Federal Acquisition Regulation authorities, historical case studies from space and defense programs, Government Accountability Office assessments, and recent senior-leader direction to accept greater acquisition risk in order to reduce operational risk, the study defines eight readiness gates—including requirement maturity, configuration stability, cost-data transparency, and supply-chain robustness—and operationalizes them as go/no-go criteria. It develops five archetypal conversion pathways, ranging from progressive risk transfer through fixed-price incentive and economic-price-adjustment instruments to direct CP-to-FFP conversion for mature recurring work. A practitioner toolkit provides checklists, sample contract line-item structures, financing-method comparisons, and risk–benefit tradeoff analysis. The paper argues that disciplined, selective conversion improves cost discipline, reduces audit and compliance burden, and frees resources for mission-focused oversight—while cautioning that premature FFP conversion can increase price, default risk, and change-order costs. |
| Description: | Presentation and Excerpt |
| URI: | https://dair.nps.edu/handle/123456789/5514 |
| Appears in Collections: | Annual Acquisition Research Symposium Proceedings & Presentations |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| SYM-AM-26-077.pdf | Excerpt | 567.37 kB | Adobe PDF | View/Open |
| SYM-AM-26-183.pdf | Presentation | 381.73 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.