Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/1552
Title: Complexity in an Unexpected Place: Quantities in Selected Acquisition Reports
Authors: Gregory A. Davis
Margaret L. Giles
David M. Tate
Keywords: Acquisition Programs
Units
Reporting Accidents
Mixed Types
Issue Date: 30-Apr-2018
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Costing
SYM-AM-18-041
Abstract: We have looked at the definition of units in numerous acquisition programs and discovered that the units reported are almost never simple; in some programs, no two units are the same, and almost invariably the units produced at the end of a long production run are substantially different from the early ones. We have identified three reasons why the units may differ. The first reason is changes over time, generally as system capabilities are improved. The second is due to mixed types, where units that are inherently dissimilar such as CH-47F and MH-47G helicopters are produced by the same program and each is called one unit. The final reason why units can differ is reporting accidents. We give examples of all three and discuss possible methods of improving the reporting requirement.
Description: Acquisition Management / Defense Acquisition Community Contributor
URI: https://dair.nps.edu/handle/123456789/1552
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
SYM-AM-18-041.pdf2.24 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.