Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/1774
Title: Developing Standard EMD Cost Factors For Major Defense Acquisition Program (MDAP) Platforms
Authors: Matthew R. Markman
Jonathan D. Ritschel
Edward D. White
Shawn Valentine
Keywords: EMD
Major Defense Acquisition Program
MDAP
Cost Factors
Work Breakdown Structure
WBS
Coefficient of Variation
CV
Issue Date: 13-May-2019
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Acquisition Management
SYM-AM-19-082
Abstract: This paper creates standard cost factors that more accurately reflect observed outcomes in the development stages of major programs. Specifically, this effort creates 443 new cost factors that are delineated by five categories: commodity type, contract type, contractor type, development type, and service. The factors are developed for those elements that are common in a wide array of projects such as program management, systems engineering, data, or training. This paper establishes factor values at the Work Breakdown Structure (WBS) element level for each subcategory of the five identified categories. Coefficient of Variation (CV) values were found to be high (71.86% to 179.87%) in each subcategory. In a refined subset of the dataset, the CV decreased, indicating that the average percent estimating error improved when more detailed information was available. The outcome of this research is that cost estimators will have a reference tool of 443 unique factors for creating estimates and conducting the iterative process of refining cost estimates.
Description: Acquisition Management / Defense Acquisition Community Contributor
URI: https://dair.nps.edu/handle/123456789/1774
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File SizeFormat 
SYM-AM-19-082.pdf445.68 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.