Title: Construction Management Module: Contingency Contracting Synergistic Approach Integrating Joint Capabilities for USSOCOM
Authors: Christopher Hearl
Keywords: Expeditionary Contracting
Contingency Contracting
Construction Management
Training
USSOCOM Operations
Synergy
Integration
Joint Capabilities
Instructional Design
Self-Instruction
Issue Date: 29-Jan-2010
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Contingency Contracting
NPS-CM-10-009
Abstract: This project investigates the effectiveness of Contingency Contracting Officers (CCOs) in executing construction requirements within the United States Special Operations Command (USSOCOM) area of responsibility (AOR). The study provides recommendations to address identified weaknesses associated with a CCO's ability to execute construction requirements for USSOCOM. One such recommendation is the development of a Construction Management Module (CM2) to better manage the contingency contracting process for construction requirements. This module will employ a synergistic approach (integrating joint capabilities) to planning and executing construction requirements in the USSOCOM contingency AOR.
Description: Contract Management / Graduate Student Research
URI: https://dair.nps.edu/handle/123456789/1966
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-CM-10-009.pdf1.8 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.