Title: Reducing Cycle Time and Increasing Value Through the Application of KVA Methodology to the US Navy Shipyard Planning Process
Authors: Christine L. Komoroski
Keywords: Knowledge Value Added
KVA
Ship Maintenance and Modernization
Return on Investment
ROI
Return on Knowledge
ROK
Information Technology
IT
Laser Scanners
Collaboration
Planning Yards
Navy Shipyards
Issue Date: 1-Dec-2005
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Knowledge Valuation Analysis (KVA)
NPS-AM-06-003
Abstract: As technology advances at an ever-quickening pace, it has become more important to identify ways to capture and measure the spectrum of benefits information technology resources can provide. In today's competitive global economy, organizations that best employ and manage knowledge assets to maximize process executions, and improve process outputs, will prosper. Through the analytic form of analysis known as the Knowledge Value Added (KVA) methodology, this thesis will identify a technique to measure the performance of knowledge assets. The resulting values can be compared in varying notional scenarios to assess potential improvements for knowledge-intensive processes. This method of analysis will demonstrate how reengineered processes enable organizations to reduce costs, and maximize knowledge creation and production capacity. A Proof of Concept was developed to analyze the long-established Shipyard planning yard processes, which supports maintenance and modernization of the U.S. Navy Fleet. With these baseline processes as the cornerstone for academic analysis, the KVA methodology shows iterations of varying scenarios using automated data capture and collaborative technology, and the return each provides. Most importantly, the methodology establishes evidence which suggests reengineered shipyard planning yard processes will shorten the duration of Navy ship availabilities, while reducing the annual operating cost of four government planning yards by more than $30 million dollars.
Description: Acquisition Management / Graduate Student Research
URI: https://dair.nps.edu/handle/123456789/2015
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-AM-06-003.pdf2.29 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.