Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2356
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMatthew Paskin
dc.contributor.authorAlice Trevino
dc.date.accessioned2020-03-16T18:10:24Z-
dc.date.available2020-03-16T18:10:24Z-
dc.date.issued2007-09-01
dc.identifier.citationPublished--Unlimited Distribution
dc.identifier.urihttps://dair.nps.edu/handle/123456789/2356-
dc.descriptionProgram Management / Graduate Student Research
dc.description.abstractThis research modeled and simulated the KC-135 aircraft Programmed Depot Maintenance (PDM) Flight Controls Repair Cell to identify improvement opportunities for greater efficiency within the flight controls repair process. PDM is conducted by the 564th Aircraft Maintenance Squadron, 76th Aircraft Maintenance Group, Oklahoma City Air Logistics Center (OC-ALC), Tinker Air Force Base, Oklahoma. The researchers focused on the repair cell internal formal and informal communication flows and information processing to evaluate the impact on flight controls repair throughput time. Computational organizational modeling was employed to examine organizational design modifications and their effect on repair cycle-time, project cost, and project risk. The modeling and simulation software used is based upon organizational design theory and information-processing research. To build the baseline organizational model that emulated the actual repair process, the researchers collected data through interviews with repair cell personnel and through observation of the repair process. Modifications called interventions were developed to simulate and analyze organizational design changes. The study concludes with the recommendation of feasible organizational design alternatives for OC-ALC decision-makers to improve the flight controls repair process and throughput time.
dc.description.sponsorshipAcquisition Research Program
dc.languageEnglish (United States)
dc.publisherAcquisition Research Program
dc.relation.ispartofseriesModeling & Simulation
dc.relation.ispartofseriesNPS-PM-07-110
dc.subjectAir Force Smart Operations for the 21st Century (AFSO21)
dc.subjectComputational Organizational Theory
dc.subjectOrganizational Modeling
dc.subjectSimulation
dc.subjectOrganizational Design
dc.subjectInformation Processing and Knowledge Sharing
dc.subjectThroughput and Cycle-Time
dc.subjectVirtual Design Team (VDT)
dc.subjectKC-135 Stratotanker
dc.subjectProgrammed Depot Maintenance (PDM)
dc.titleEmploying Organizational Modeling and Simulation to Deconstruct the KC-135 Aircraft Programmed Depot Maintenance Flight Controls Repair Cell
dc.typeTechnical Report
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-PM-07-110.pdf1.25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.