Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2826
Title: Material Planning for Remanufacturing Defense Assets
Authors: Geraldo Ferrer
Keywords: Depots Remanufacturing Components
Multi-Period Material Planning System
Linear Programming
Issue Date: 1-Mar-2008
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Acquisition Strategy
NPS-PM-08-020
Abstract: This paper develops a planning system for depots remanufacturing components of defense assets, such as helicopters, armored cars, and so forth. These depots take in used assets, disassemble them, repair, upgrade and reassemble them to supply US troops and, occasionally, foreign military services of allied nations. Uncertainty in the supply of used components, the yield of good parts, and the demand for remanufactured products makes this a difficult process to manage. This article describes a multi-period material planning system for the process. It covers everything from collection to final delivery. The system is based on material requirements planning, a method familiar to many managers. It uses linear programming to develop purchase recommendations and to schedule the disassembly of the used components. The researcher held meetings with remanufacturing practitioners to set the system parameters and to evaluate the approach.
Description: Acquisition Management / NPS Faculty Research
URI: https://dair.nps.edu/handle/123456789/2826
Appears in Collections:Sponsored Acquisition Research & Technical Reports

Files in This Item:
File SizeFormat 
NPS-PM-08-020.pdf274.73 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.