Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/4597
Title: DoD Program Management Competency Model
Authors: Justin Hughes
Daniel Flanigan
Keywords: Acquisition Workforce (AWF)
Project Manager (PM)
Competency Model
Issue Date: 5-May-2022
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Acquisition Management;SYM-AM-22-101
Abstract: As of today DOD project management is structured differently from industry. Industry has made advancements in PM that the DOD should consider for adoption. By better aligning the DOD and industry recognized competency standards, the DOD may be able to better address long observed cost, schedule, and performance issues.
Description: Symposium Student Poster
URI: https://dair.nps.edu/handle/123456789/4597
Appears in Collections:Annual Acquisition Research Symposium Proceedings & Presentations

Files in This Item:
File Description SizeFormat 
SYM-AM-22-101.pdfStudent Poster345.5 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.