Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/4597
Title: | DoD Program Management Competency Model |
Authors: | Justin Hughes Daniel Flanigan |
Keywords: | Acquisition Workforce (AWF) Project Manager (PM) Competency Model |
Issue Date: | 5-May-2022 |
Publisher: | Acquisition Research Program |
Citation: | Published--Unlimited Distribution |
Series/Report no.: | Acquisition Management;SYM-AM-22-101 |
Abstract: | As of today DOD project management is structured differently from industry. Industry has made advancements in PM that the DOD should consider for adoption. By better aligning the DOD and industry recognized competency standards, the DOD may be able to better address long observed cost, schedule, and performance issues. |
Description: | Symposium Student Poster |
URI: | https://dair.nps.edu/handle/123456789/4597 |
Appears in Collections: | Annual Acquisition Research Symposium Proceedings & Presentations |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
SYM-AM-22-101.pdf | Student Poster | 345.5 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.