Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2344
Title: An Analysis of Contracting Activity Purchase Request Acceptance Lead Time for USMC Using Unit Acquisitions Under the Simplified Acquisitions Threshold
Authors: Capt. Paul Kantner
Capt. Korey Leggerle
Keywords: Acquisition Lead Time
Federal Acquisition Regulation
Procurement Acquisition
Purchase Request Acceptance
Acquisition Contract
Lead Time
Acquisition Planning
Issue Date: 21-Jan-2020
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Contracting
NPS-CM-20-018
Abstract: This project analyzes the purchase request acceptance lead time (PRALT) for United States Marine Corps (USMC) acquisitions under the simplified acquisition threshold from unit requirement generation to acceptance by a contracting entity. We evaluate the lead time required prior to the start of the procurement acquisition lead time (PALT) measurements to determine how the length of PRALT affects units ability to receive valid contract requirements. With this project, we reviewed various contracting procedures and conducted a literature review of current contracting practices and the procurement environment. We use quantitative data from approved program systems of record to review the amount of time required from the contract package proposal to acceptance into the contract PALT process. This review allows us to analyze variations in PRALT and identify factors delaying acceptance of a contracting package. From this analysis, we develop policy recommendations to further decrease total acquisition lead time.
Description: Contract Management / Graduate Student Research
URI: https://dair.nps.edu/handle/123456789/2344
Appears in Collections:NPS Graduate Student Theses & Reports

Files in This Item:
File SizeFormat 
NPS-CM-20-018.pdf2.16 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.