Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/2692
Title: Total Ownership Cost Reduction Case Study: AEGIS Microwave Power Tubes
Authors: Aruna U. Apte
Eugene (Joe) Dutkowski
Keywords: AEGIS
Total Ownership Cost
TOC
Mean Time Between Failure
MTBF
Microwave Tubes
MWT
Business Processes
Cross Field Amplifier
CFA
Issue Date: 1-May-2006
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Total Ownership Cost (TOC)
NPS-AM-06-008
Abstract: This research provides a descriptive case study that chronicles the operational and engineering processes that were used to reduce total ownership cost for microwave power tube components of the AEGIS Shipbuilding Project while dramatically improving their mean time between failure. The processes used to achieve these results are important to understand in light of the current reductions in various acquisition support resources including financial support, manpower and in-house technical expertise. In particular, this case highlights the role that Naval Warfare Centers can and do play in the acquisition process and its supporting engineering disciplines.
Description: Acquisition Management / NPS Faculty Research
URI: https://dair.nps.edu/handle/123456789/2692
Appears in Collections:Sponsored Acquisition Research & Technical Reports

Files in This Item:
File SizeFormat 
NPS-AM-06-008.pdf673.73 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.