Please use this identifier to cite or link to this item:
https://dair.nps.edu/handle/123456789/2692
Title: | Total Ownership Cost Reduction Case Study: AEGIS Microwave Power Tubes |
Authors: | Aruna U. Apte Eugene (Joe) Dutkowski |
Keywords: | AEGIS Total Ownership Cost TOC Mean Time Between Failure MTBF Microwave Tubes MWT Business Processes Cross Field Amplifier CFA |
Issue Date: | 1-May-2006 |
Publisher: | Acquisition Research Program |
Citation: | Published--Unlimited Distribution |
Series/Report no.: | Total Ownership Cost (TOC) NPS-AM-06-008 |
Abstract: | This research provides a descriptive case study that chronicles the operational and engineering processes that were used to reduce total ownership cost for microwave power tube components of the AEGIS Shipbuilding Project while dramatically improving their mean time between failure. The processes used to achieve these results are important to understand in light of the current reductions in various acquisition support resources including financial support, manpower and in-house technical expertise. In particular, this case highlights the role that Naval Warfare Centers can and do play in the acquisition process and its supporting engineering disciplines. |
Description: | Acquisition Management / NPS Faculty Research |
URI: | https://dair.nps.edu/handle/123456789/2692 |
Appears in Collections: | Sponsored Acquisition Research & Technical Reports |
Files in This Item:
File | Size | Format | |
---|---|---|---|
NPS-AM-06-008.pdf | 673.73 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.