Please use this identifier to cite or link to this item: https://dair.nps.edu/handle/123456789/4323
Title: It’s about Time: Toward Realistic Acquisition Schedule Estimates
Authors: Charles Pickar, Raymond Franck
Keywords: Scheduling
Project management
Issue Date: 25-Mar-2021
Publisher: Acquisition Research Program
Citation: Published--Unlimited Distribution
Series/Report no.: Scheduling;NPS-PM-21-037
Abstract: This paper is part of a research agenda outlined in Franck, Hildebrandt and Udis (2016) – directed toward improving the realism of defense acquisition schedules. Defense acquisition schedules have long been a difficult problem. In this particular effort, we consider primarily the case of the 737MAX – which has been a fortuitous example of the risks of scheduling-by-fiat. We analyze the 737MAX misadventure using Systems Dynamics and Root Cause Analysis methods.
Description: Program Management / Faculty Report
URI: https://dair.nps.edu/handle/123456789/4323
Appears in Collections:Sponsored Acquisition Research & Technical Reports

Files in This Item:
File Description SizeFormat 
NPS-PM-21-037.pdfTechnical Report874.05 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.